The frame stage is well underway on the ground level extension which will be for the three bedrooms, bathroom with seperate shower and toilet, laundry, rumpus room with kitchenette and storage/workshop.

On the upper level the old French doors to the verandah have been removed and the opening altered to suit a new set of 4.8m timber Bi-folding doors.  This is part of the alterations to the existing layout where an exisitng bedroom is being demolished to make way for a new family room.