The rendered retaining wall at the end of the carport is ready for the pool fence to be errected and the external stairs which lead down to the lower area of the extension have been built.  The water tank is installed and the new carport is ready for the painters.

Downstairs in the new kitchen / laundry area of this home extension and renovation in Brisbane the stone bench tops are in and Peter the tiler has finished laying the kitchen floor tiles and is now tiling the new bathroom. (he’s camera shy!)  Carl the plumber is due next to fit off the kitchen and bathroom as well as Andrew the electrician.

The painters have been busy in the new downstairs extension and will be clear coating all the remaining timber doors and windows.   Once the new bamboo flooring has been laid and polished in the lower extension, the last of the second fix stage can be completed with the skirting boards fixed and painted.

The patio outside the new lower kitchen and lounge extension has had the old pavers removed and new stormwater drainage laid and is ready for concreting.  This area will then be paved making it such cool dry place for entertaining and can be extended even further by opening up the large bi-fold doors and kitchen bi-fold windows.  The office mouse will just have to get back here late in the week to see the latest progress!