The rear view of the lower level extension progress at the Wavell Heights home.

  

Lower level internal view of the new seperate laundry, rumpus room and the second bedroom ready for the walls to be lined with “Gyprock” plasterboard. The second photo is of the bathroom with the third and fourth bedrooms either side.

The bathroom floor has been wet sealed and Peter the tiler is in the process of bedding the bathroom floor in preparation for tiling.

  

These photos show the upper level extension and renovation of the kitchen and family rooms to the Brisbane home. The upper level walls will be lined with VJ sheeting. The new timber windows and Bi-fold doors are by Darra Joinery.

  

This view on the upper level shows the framing for the butlers pantry and the powder room directly behind it. The powder room floor has been tiled ready for the internal lining next week.