Update Renovates carpenters Tim and Luke have the framing well underway and are working to have this renovation stage ready for Rob the bricklayer to build the retaining walls while the access is still open and before the windows, doors and external cladding are installed to the lower walls.
Tim has made final checks with the Clients to confirm all internal layout measurements, including fitted bench tops, opening sizes for white goods installation in the wet bar and laundry.
Its always great to see the framing up you get a much better idea on the layout and room sizes.
This build-in-under extension will give these Brisbane clients a great new area effectively doubling their current house size and living space!