The office mouse can’t believe how much Tim and Luke have achieved in just a week at this “build-in-under” extension job in Moorooka Brisbane. All the ground level framework and bracing is up and the lower roof has been built and is ready for roof sheeting.
The windows are arriving early in the week so by the end of this week they expect the windows to be in and most of the sarking up on the lower external walls. The plumber and electrician will be doing their preliminary work prior to the internal wall sheeting being instaled. I’m droping back there late this week to take more photos as there will be plenty to see!