In this “build-in-under” home renovation and extension in Brisbane the new lower level is about to have the ceilings sheeted by Gavin and the team from “Jake Plasterers”.
Upstairs our “ace team” carpenters Tim, Rob and Lachy have removed the internal wall, archways and old external doors in the living area.
The living space has changed dramatically with the wall removed and the installation of the new bi-fold door it will make such a difference to the natural light and airflow to the now much larger lounge / dining area.
The internal stairs will be installed next week and the ceilings will be finished downstairs so there will be plenty for the office mouse to photograph and talk about on the Blog!