The lower level extension in this Brisbane home is looking great the internal doors are all in, the second fix stage is all but finished. Rob and Lachy are just waiting on the new kitchen to arrive and then they will be able to finish the kitchen area. Tim has finished off the two built-in-robes in the bedrooms and the storage cupboard shelving. This dedicated storage room downstairs in the new extension is a fantastic design idea.
The handrails are in on the internal stairs so the whole upper level is ready for the floor sander and the painters. Outside Rob and Lachy have got the new double carport well underway with the frame work done and Robbie the brick layer is laying the block retaining wall at the end of the carport.
The office mouse will be back to this home extension and renovation job in Brisbane at the end of the week to see all the latest progress.